New Space Update #4 – Paint, paint, paint

Trunking

HackSpace 3.0 is coming along nicely – there is trunking installed ready and waiting for electrical cabling and the Hack The Space day this Saturday was well attended. People picked up job cards and got to work, meaning that we now have (amongst other things) clean and tidy toilet, at least three coats of white paint on the kitchen walls, a few coats of paint on the foyer area and a door handle moved to the correct side. A sincere thanks to everyone who came down to help out, every little helps.

Toilets

The toilet cubicles themselves have also had another coat of paint to bring them all up to the same level. Please don’t try and open the middle cubicle window, it might fall off its hinges! Re-installation of door hardware will be happening this week meaning that we will have three (yes, three) working, individually partitioned toilet cubicles ready for use by the weekend. Nav has installed the mirrors
Andy has built a cupboard in the back of the toilet block – this is where you will find blue roll, toilet paper and eventually the hoover. Importantly, this is also where cleaning products are located.

Back Corridor

Back Wall

If you want to lend a hand but really aren’t sure where to start, simply ask on IRC (#leeds-hack-space on freenode), Slack or the Mailing List and someone will be able to point you in the right direction.

This entry was posted in LHS Update. Bookmark the permalink.